Blog categorized as Storm Water Compliance

California IGP Annual Report Season: Stay Ahead and Stay Compliant
Get your California IGP annual report ready by July 15. Ensure accurate sampling, full certification, and maintain compliance with ease.
California Industrial Stormwater Compliance in 2026
California’s stormwater regulations continue to evolve, and facilities need to stay ahead of monitoring, reporting, and BMP requirements. This guide breaks down what industrial operators should know for 2026 and how to prepare.
Stormwater Sampling Readiness: How Industrial Facilities Can Avoid Failed Samples Before They Happen
Learn how industrial facilities can improve sampling readiness, reduce exceedances, and strengthen stormwater performance before the next storm event.
A New Year, Two Required Samples: What Industrial Facilities Need to Know Under the IGP
For IGP-covered facilities, the new year means it’s time to collect the final two required stormwater samples. Learn how the second half of the reporting year works and what’s needed to stay compliant by June 30.
What to Do After a Benchmark Exceedance: Next Steps for IGP Compliance
Learn what to do after a stormwater benchmark exceedance under California’s IGP. From Level 1 ERA reporting to BMP updates, Frog Environmental guides you through every step to stay compliant.